18.08.2023 Tarihinde VLADIMIR TIKHONOV gemisinin73 m derinlikte zincirin deniz tabanına değdiği noktaya kadar Rov ile takip edilerek çapasının herhangi bir objeye ( kablo, boru hattı vb. ) takılmadığı tespit edilip sorunsuz bir şekilde çapa ve zincir toplanmıştır.

On 30.11.2023, FAVORITE was followed by ROV until the point where the chain touches the seabed at a depth of 49 m and it was determined that the anchor was not attached to any object (cable, pipeline, etc.) and the anchor and chain were collected without any problems.

On 05.12.2023, SEA INSPIRATION was followed with ROV until the point where the chain touches the seabed at a depth of 49 m. It was determined that the anchor was not attached to any object (cable, pipeline, etc.) and the anchor and chain were collected without any problems.

On 07.12.2023, MATIN BEY was followed by ROV until the point where the chain touched the seabed at a depth of 49 m and it was determined that the anchor was not attached to any object (cable, pipeline, etc.) and the anchor and chain were collected without any problems.

On 06.07.2024, PRINCESS LAYLA was followed by ROV until the point where the chain touches the seabed at a depth of 80 m and it was determined that the anchor was not attached to any object (cable, pipeline, etc.) and the anchor and chain were collected without any problems.

On 06.07.2024, TG ARKTIKA was followed with ROV until the point where the chain touches the seabed at a depth of 80 m. It was determined that the anchor was not attached to any object (cable, pipeline, etc.) and the anchor and chain were collected without any problems.

On 09.11.2024, UZAY ship was followed with ROV at a depth of 75 m until the point where the chain touches the seabed and it was determined that the anchor was not attached to any object (cable, pipeline, etc.) and the anchor and chain were collected without any problems