SHIP LOADING AND UNLOADING SYSTEMS AND OILPIPELINE’S MAINTENANCE SERVICES
CEKISAN STORAGE SERVICES
Ambarli Terminal CBM System – Fuel oil hose test and maintenance
Ambarli Terminal – Underwater powerlines maintenance works
Antalya Terminal – CBM system fuel oil hose tests and maintenance
Antalya Terminal – Nitrogenline maintenance works
Ambarli Terminal – 950 meter 10” steel pipeline settlement work
Ambarli Terminal – 380 meter 8” steel pipeline settlement work, ISPS emergency agreement up to 2015, Ambarli Terminal CBM system maintenance work.
IGDAS
Surveying and reporting of pipelines between Princes’ Islands and Maltepe including Big Island – Heybeli Island – Burgaz Island – Kınalo Island
AYGAZ AS
Gazal / Izmit Terminal CBM system valve changing
Ambarli/Istanbul Terminal Sea platform survey and mechanical work
Ambarli and Izmit Terminal ISPS emergency agreement up to 2017
BOTAS
Botas Marmara transition natural gas pipeline survey, maintenance, repair and pickling on(55 m depth)
Ambarli Cakar buoy maintenance and substitution
Landing wreckage from 55 meter
ROV Service
Concrete infilling work (With diver Skill 65 m)
Infilling work on the pipeline
Thickness measurement from the top of pipeline in the Depth of 87 meter